Skip to content
  1. Ofgem58

    Ofgem consults on Asset Health Inspectorate regulatory arrangements

    Ofgem has opened a consultation on proposed Asset Health Licence Conditions and a draft Asset Health Inspectorate Audit Methodology, closing 11 January 2027. The AHI would provide independent regulatory assurance of how network companies manage and maintain assets, initially covering incumbent electricity transmission, electricity distribution, gas transmission and gas distribution licensees.

    Why it matters: The consultation sets out how an independent inspectorate would audit network asset management, giving licensees a chance to shape the licence conditions and audit method before Q1 2027.

  1. Utility Dive58

    NERC finds most U.S. generators prepared for extreme cold

    NERC reported that about 94% of bulk power system capacity can be called on to operate below 32 degrees, and 99% of total net winter capacity in the continental U.S. said it could operate at calculated extreme cold temperatures. Units making up 4.3% of capacity are implementing corrective action plans, 60% of which will be completed before this winter, while about 7.4% declared a constraint. Owners reported 1,154,231 MW of net winter capacity, up 7% from winter 2024-2025.

    Why it matters: NERC's capacity-level tallies show how much winter capacity still carries cold-weather constraints and how quickly corrective plans are closing, useful context for winter readiness planning.

You've reached the end