Power Line·· 10 days agoAI score42
Tata Power commissions 100.8 MW wind project in Maharashtra
AI summary
Tata Power Renewable Energy Limited has commissioned a 100.8 MW wind project at Ausa, Latur, Maharashtra, comprising 28 horizontal axis wind turbine generators. The project will supply renewable electricity to Tata Power Mumbai Distribution (TPC-D) and is expected to generate around 308 MUs annually. TPREL's total renewable utility-scale capacity has risen to 12.1 GW.
Source: Power Line · powerline.net.in