Power Line·· 8 h agoAI score34
Juniper Green Energy signs 150 MW hybrid PPA with NTPC
AI summary
Juniper Green Energy, through subsidiary Juniper Green Gem, has signed a 25-year PPA with NTPC for a 150 MW hybrid renewable project, with commercial operation scheduled by June 2028. The deal lifts Juniper Green Energy's contracted renewable capacity to about 6.4 GWp, alongside 4.3 GWh of battery energy storage capacity.
Source: Power Line · powerline.net.in