SP PowerAssets awards 400 kV grid contract to Taihan Cable
Singapore’s SP PowerAssets awards 400 kV grid contract to South Korea’s Taihan Cable
Taihan Cable & Solution has won a KRW271.8 billion turnkey contract from Singapore's SP PowerAssets Limited to develop a 400 kV ultra-high-voltage power grid. Taihan will handle design and manufacture of extra high-voltage cables and associated equipment, plus installation, connection and testing.
The award shows the scope and value of a 400 kV cable package that includes design, installation and testing, useful for suppliers tracking UHV cable procurement in Singapore.
For test engineers, the turnkey scope explicitly includes testing of 400 kV UHV cables and associated equipment, so commissioning will need to cover after-installation tests such as insulation resistance, DC high-potential or AC withstand testing, and partial discharge measurement, with acceptance criteria set against the applicable cable standards. Engineers should confirm the test plan, instrument calibration and record-keeping are agreed before installation, and watch for how jointing and termination quality is verified, since connection work precedes the testing phase.
Written by AI from the report; check test procedures against the standard itself.
Source: Power Line · powerline.net.in