ACME Solar arm signs 150 MW hybrid PPA with NTPC
The story so far
ACME Solar Holdings said its subsidiary ACME Alpha Renewable has signed a power purchase agreement with NTPC for a 150 MW inter-state transmission-connected hybrid project at a tariff of INR 3.21 per unit. The project combines solar, wind and energy storage across sites in Bhadla (Rajasthan), Jambkhabalia (Gujarat) and Mandsaur (Madhya Pradesh). According to ACME, the project was awarded under NTPC's Hybrid-IV tranche and the Central Electricity Regulatory Commission has adopted the tariff.
Written by AI from the reports · updated 9 days ago
Coverage timeline
Follow the reports to see different sides of the story.
- Power LineSelectedACME Solar signs PPAs with RUMSL and NTPC for solar and hybrid projects
ACME Solar Holdings subsidiaries have signed two 25-year PPAs. ACME Greentech Sixteen will build a 220 MW solar project with BESS at Morena Solar Park in Madhya Pradesh for RUMSL at Rs 2.764 per unit, operating by December 31, 2027. ACME Alpha Renewables signed with NTPC for a 150 MW ISTS-connected hybrid solar, wind and storage project at Rs 3.21 per unit, supplying from June 30, 2028. ACME's PPA-backed under-construction portfolio now totals 5,080 MW.
- ETEnergyWorldSelectedACME Solar signs 150 MW hybrid power PPA with NTPC
ACME Solar Holdings said its arm ACME Alpha Renewable has signed a PPA with NTPC for a 150 MW ISTS-connected hybrid project at INR 3.21 per unit. The project spans Bhadla in Rajasthan, Jambkhabalia in Gujarat and Mandsaur in Madhya Pradesh, combining solar, wind and energy storage. It was awarded under NTPC's Hybrid-IV tranche, with the tariff adopted by the Central Electricity Regulatory Commission.